Skip to main content
Standards

GOST 8966-75 Steel Connecting Parts with Cylindrical Thread for Pipelines P=1.6 MPa. Straight Sockets. Basic Dimensions

GOST 8966-75 · General fastener standards

This is an informational translation of a Russian national standard. The Russian original is authoritative.

GOST 8966-75 applies to steel straight sockets with zinc coating and without coating, with cylindrical thread. The sockets are used for joining water and gas pipes with a sealant in heating, water supply, gas supply and other systems operating in non-aggressive media (water, saturated steam, combustible gas, etc.) at a medium temperature not exceeding 175 °C and pressure P=1.6 MPa.

The standard complies with ISO Recommendation R50.

STEEL CONNECTING PARTS WITH CYLINDRICAL THREAD FOR PIPELINES P=1.6 MPa. STRAIGHT SOCKETS. Basic dimensionsGOST 8966-75 Supersedes GOST 8966-59

The basic dimensions of sockets shall comply with those shown in the drawing and table.

Nominal bore Dy, mmThread dLSWeight without coating, kg
mm
81/4² pipe253.50.023
103/8² pipe263.50.036
151/2² pipe344.00.067
203/4² pipe364.00.086
251 1/4² pipe435.00.163
321 1/2² pipe485.00.220
401² pipe485.00.255
502 ² pipe565.50.409
652 1/2² pipe656.00.663
803 ² pipe716.00.838
1004 ² pipe838.01.801
1255 ² pipe928.02.374
(150)6 ² pipe9210.03.560

Notes:

  1. When sockets are manufactured from furnace-welded pipes, an increase in wall thickness, and correspondingly weight, of up to 25% is permitted.

  2. Sockets with Dy values shown in brackets are manufactured upon customer request.

Examples of designations

Straight socket without coating with Dy=50 mm:

Socket 50 GOST 8966-75

The same, with zinc coating:

Socket 50-Ts GOST 8966-75

Sockets are manufactured in accordance with the requirements of GOST 8965-75.

Request

Estimate for the “GOST 8966-75” category

Send a specification or specify volumes — we will prepare a commercial proposal with timelines and payment terms within one business day.

Get in touch

Request a commercial proposal

Describe your task or attach a request — a manager will prepare an estimate and get in touch within one business day.

Request a quote