Materials

Materials of the production network

Fifteen material groups — from carbon steels to titanium, polymers and composites. Selecting the material for the operating conditions and standard is part of FLOK's engineering work.

Material groups

Fifteen groups

The production network works with the full range of structural materials — matched to the product, environment and standard.

01

Carbon steels

St3 · St10 · St20 · St45

02

Alloy steels

40Kh · 40KhN2MA · 30KhGSA

03

High-strength steels

Classes 10.9–12.9

04

Corrosion-resistant steels

20Kh13 · 14Kh17N2

05

Heat-resistant steels

25Kh1MF · 25Kh2M1F

06

Cold-resistant steels

09G2S — to −70 °C

07

Stainless steels

12Kh18N10T · A2 · A4

08

Aluminium and alloys

AMg · D16T

09

Brass

L63 · LS59

10

Bronze

BrAZh9-4 · BrOTsS

11

Copper

M1 · M2

12

Titanium and alloys

VT1-0 · VT6

13

Polyamide

PA6 · PA66

14

Textolite

PT · PTK

15

Composites

Glass-filled and special

Grade reference

Common grades and their use

Approximate use of grades in fasteners and parts. Exact selection follows the operating conditions and documentation.

Grade Group Typical use
Ст3 Carbon structural Embeds, steelwork, foundation bolts v1.1
Ст20 Quality carbon Shafts, axles, bushings under moderate loads
09Г2С Low-alloy Steelwork and cold-resistant products to −70 °C
40Х Alloy structural Class 10.9 fasteners, shafts, gears
40ХН2МА Alloy Q&T Critical shafts and spindles, class 12.9 fasteners
20Х13 Martensitic stainless Fasteners and parts for steam and water
12Х18Н10Т Austenitic stainless Fasteners and products for chemicals and up to +600 °C
25Х1МФ Heat-resistant Flange studs for power and petrochemicals
Л63 Brass Conductive fasteners, fittings, decorative products
ВТ1-0 Titanium Light corrosion-proof fasteners for aviation and chemicals
ПА6 Polyamide Bushings, rollers, dry-running friction parts

Standards and certificates

GOST ↔ DIN ↔ ISO mapping is on the standards page. Certificates and test reports ship with every batch on request.

Get in touch

Request a commercial proposal

Describe your task or attach a request — a manager will prepare an estimate and get in touch within one business day.

Request a quote